Quantify avoided interruption cost for DTM+ deployments serving commercial and industrial customers. Uses the Berkeley Lab / DOE Interruption Cost Estimate (ICE) Calculator 2.0 non-residential cost functions (LBNL Phase 1 final report, 29 May 2025), with preset rate tables by utility ownership type. For regulatory submissions, validate against the live ICE 2.0 tool with utility-specific customer-mix data.
| Stream / Metric | Value |
|---|---|
| Reliability — avoided customer-interruption cost | — |
| # of transformers monitored | — |
| Avoided customer-minutes / year | — |
| Blended $ / CMI rate Suburban | — |
| Annual reliability benefit | — |
| O&M — avoided truck rolls | — |
| Baseline truck rolls / year — | — |
| Truck rolls avoided (% × baseline) | — |
| Applied $ / truck roll | — |
| Annual O&M benefit | — |
| Risk avoidance — regulatory & SLA | — |
| Total annual exposure (reg + SLA) | — |
| Annual risk-avoidance benefit | — |
| Revenue protection & enablement | — |
| C&I revenue protected (hours × $/hr) | — |
| New-service enablement | — |
| Annual revenue benefit | — |
| Avoided equipment failure | — |
| Baseline catastrophic failures / yr | — |
| Failures converted to planned | — |
| Savings per converted failure | — |
| Annual equipment-failure benefit | — |
| Total annual benefit (all streams) | — |
| Cost — DTM+ investment Capex | — |
| Upfront cost (capex) | — |
| Recurring cost / year | — |
| Year 1 total cost | — |
| Lifetime cost (horizon) | — |
| Net annual (Benefit − Recurring cost) | — |
| Net NPV (horizon · discount) | — |
| Payback / Lifetime ROI | — |
Every default in this calculator traces back to a published source listed below. Refresh quarterly. Verified May 2026.
| Assumption | Default in model | Industry source | Date |
|---|---|---|---|
| Reliability $/CMI rates (IOU non-residential) | $110 mom · $30 (2hr) · $16 (8hr) · $10 (24hr) | Berkeley Lab — ICE Calculator 2.0 Phase 1 final report (24-utility survey 2022–2024). Refresh against the live ICE 2.0 tool for regulatory submissions. | 29 May 2025 |
| US national SAIDI baseline | 335 min incl. ME / 140 min excl. ME | EIA Form 861 2023 detailed data files (released Oct 2024); EIA Today in Energy 2022 reliability summary. | 2023 data, Oct 2024 |
| Truck-roll cost | $750 / roll | S&C Electric — "The Real Cost of a Truck Roll" ($250–$1,000+); TSIA ~$1,000 fully loaded. | 2017 (re-cited 2022) |
| Distribution transformer annual failure rate | 0.5% / yr (mid-life default) | IEEE 493 baseline ≈0.41%; multi-utility studies 0.35–0.46% (2018–2019); ComEd <0.5%; aged fleet 1–2%. | IEEE 493; peer-reviewed 2018–2019 |
| Replacement cost (3-phase pad-mount) | $25K catastrophic / $12K planned | Newton-Evans — A Mid-2024 Assessment of the U.S. Distribution Transformer Industry; vendor pricing 2024–2025; DOE LPT Resilience Report for context. | Mid-2024 |
| Value of lost load (revenue at risk) | $0 / hr (utility-specific input) | Brattle / ERCOT — Review of VOLL (interim $25K–$50K/MWh C&I); MISO Scarcity Pricing white paper (Apr 2024); literature range $11K–$67.78K/MWh. | Sep 2024 |
| Discount rate (IOU / Muni / Coop) | 7.0% / 4.0% / 3.5% | IOU WACC 6.5–8% range; muni tax-exempt bond rates 3–4%; CFC / RUS coop loan rates 3–4%; CPI ~3% (BLS). | Generally accepted finance practice |